January 2024currently
1 year 8 months
Technical Office Chief at Amur Gas Chemical Complex, Svobodniy city, Amur region, Russia
Budget & planning
April 2023January 2024
10 months
Chief of Underground Piping Works At AGCC Project (Svoboyniy city, Amur Region, Russia).
Amur Gas Chemical Complex
February 2021October 2022
1 year 9 months
Esta construction

Ust-Ilimsk

Construction, Real Estate, Architecture... Show more

Senior Mechanical Engineer at the Construction of Ust-Ilimskiy LPK (Pulp Mill Plant).
Managed Mechanical Construction (HVAC) and Piping erection activities. - Managed and followed up procurement on supplying of project material and consumables. - Managed and followed up procurement on supplying of material for workshops. - Defined and calculated required scope of scaffolding for pipeline erection and insulation works. - Negotiated with specialized subcontractors on pipeline erection, painting, scaffolding, and insulation works. - Checked, and approved method of statements for painting, HVAC, pipeline, and scaffolding works
September 2019May 2020
9 months
Renaissance Heavy Industries

Karaganda

Mechanical Piping Lead Engineer at Jairem Copper Mine Project/ Kazakhstan.
Coordinated Mechanical Construction (HVAC) and piping erection activities. - Checked drawings, technical documentation, standards, and regulations for installation. - Checked and Prepared site Technical Queries, method of statements, and test procedures. - Made installation schedules and reports. - Managed installation in accordance with technical requirement regulation and standards (GOST, SP, Snip). - Implemented HSE procedures and standards for the areas where construction activities are produced. - Supervised contractors' performance: meeting construction deadlines, company standards compliance, HSE rules and regulations compliance, quality supervision (along with QA/QC department). - Conducting weekly Toolbox meeting on production issues, as well as on safe execution of works.
September 2018September 2019
1 year 1 month
Renaissance Heavy Industries (RHI, Subcontractor of Tecnimont Russia)

www.rhi.ronesans.com

Oil and Gas... Show more

Mechanical Steel & Equipment Engineer on Amur Gas Processing Plant/Russia.
Coordinated Equipment, and Steel Structure (Buildings & Pipe racks) installation activities. - Checked drawings, technical documentation, standards, and regulations for installation. - Prepared site Technical Queries, method of statements and OSHL lifting plans. - Made equipment and steel installation schedules and reports. - Managed installation in accordance with technical requirement regulation and standards (GOST, SP, Snip and STO NOSTROY). - Implemented HSE procedures and standards for the areas were construction activities held. - Supervised contractors' performance: meeting construction deadlines, company standards compliance, HSE rules and regulations compliance, quality supervision (along with QA/QC department). - Conducting weekly Toolbox meeting on production issues, as well as on safe execution of works.
July 2014August 2018
4 years 2 months
BORUSAN MAKINA KAZAKHSTAN LLP FE

Almaty, www.borusanmakina.kz

Power Industry... Show more

Application Mechanical Engineer at Borusan Makina Kazakhstan LLP FE.
Managed Installation and startup activities for cogeneration and trigeneration gas power plants (including gas generator sets CATERPILLAR, diesel generator sets CATERPILLAR, pumps, exchangers, dry coolers, gas boilers, hot water boilers, steam boilers, dry&oil transformers, LV MV HV switchgears). - Managed and controlled design of cooling, lubrication, heating, heat recovery and HVAC systems. - Controlled technical documentation, PID drawings, schedules, startup procedures and FAT procedures. - Managed manufacturing and erection of pipelines, HVAC systems. - Managed montage team while Mechanical erection works - Managed start-up team while Load test and synchronization of power plants - Assisted sales team for choosing correct generator sets (power plants) suitable for customer needs, - Assessed customer site for installation requirements, installation and design, - Provided technical support contact team while making contracts with suppliers and buyers, Completed power plant projects: - ADAOIL, gas generator set, parallel with grid, 2 x 975kW Caterpillar G3516LE (Aktobe KAZAKHSTAN) - SAMEK International, gas generator set island mode project, 1x725 kW Caterpillar G3512LE (Atyrau KAZAKHSTAN) - Evraz Metal, gas generator sets, parallel with grid, 2x725 kW Caterpillar 2xG3512LE (Aktobe KAZAKHSTAN) - ORMET, gas generator sets, parallel with grid COGENERATION project, 6 x 2465 kVA Caterpillar G3520C + 6 x HOT WATER BOILER (Aktobe KAZAKHSTAN) - COCA COLA Almaty gas generator sets COGENERATION project, parallel with grid, 2x2500 kVA Caterpillar G3520C IM + 2 x HOT WATER BOILER + 2 x STEAM BOILER + 1 x Transformer 10,5/0,4kV (Almaty KAZAKHSTAN) - KPJV TCO diesel generator sets project, 11 x 500KVA Caterpillar C13 +1 x 1600KVA Caterpillar 3516 + 3 x 50KVA Olympian GEP50 (Atyrau KAZAKHSTAN) - KENSARY, gas generator set project, 4 x 975 kW Caterpillar G3516 LE + 10 kV MV Substation + 2 x TRANSTORMER 10,0/0,4kV + 0,4 KV Substation (Aktau, Beyneu KAZAKHSTAN) - FOODTOWN, gas generator set TRIGENERATION project, 2 x 576 kW CG132-12 + 2 x HOT WATER BOILER + 2 x GAS BOILER + 2 x CHILLER (Almaty KAZAKHSTAN) - SHYMKENTMAI, gas generator sets COGENERATION project, 2 x 1200 kW CG170-12 + 0,4/10,0kV Transformer + 10,0kV MV Substation (Shymkent KAZAKHSTAN) -KAZPACO (BI GROUP), diesel generator set project, 2x2000 kVA Caterpillar 3516 + 2x1600 kVA Caterpillar 3512 + 3 x 810 kVA Caterpillar 3412C + 3 x 650 kVA C18 + 2 x 400 kVA Caterpillar C13 (Aturau, Prorva KAZAKHSTAN)
April 2013November 2013
8 months
Alsim Alarko Sanayi Tesisleri ve Ticaret A.Ş

Pavlodar, alsimalarko.com.tr

Construction, Real Estate, Architecture... Show more

Mechanical Piping Engineer at Bozshakol Copper Mine Project / Kazakhstan
Supervised pipeline manufacture at the stage of pre-fabrication in accordance to KazakhMys company standards. Supervising pipeline spools and valves erection and installation. Supervised hydraulic and pneumatic tests. Participating in systems handover and acceptance for operations. Prepared schedules and reports. Completed Installation of pipelines at work sites; - Permanent camp, HDPE pipes - Ball mill building, carbon steel pipes - Core Compilation area, HDPE + carbon steel pipes - Floatation area, HDPE + carbon steel pipes - Sag mill building, HDPE + carbon steel pipes

Skills

Skill proficiency levels
AutoCAD
MS Office

Driving experience

Own car

Driver's license category B

About me

I have excellent IT and analytical skills. Strong interpersonal, team-oriented, self-motivated and problem solver. Competent in Microsoft Office Programs (excel, word) Outlook, AutoCAD

Higher education

2011
Erciyes University (TURKEY)
Faculty of Engineering, Mechanical Engineering Department

Languages

RussianNative


EnglishC2 — Proficiency


KazakhC2 — Proficiency


TurkishC2 — Proficiency


Professional development, courses

2018
SIGUR
SIGUR, Construction control (Highly hazardous, technically complex and unique objects)

Tests, examinations

2018
SIGUR
SIGUR, Construction control (Highly hazardous, technically complex and unique objects)

Citizenship, travel time to work

Citizenship: Kazakhstan

Permission to work: Kazakhstan, Russia

Desired travel time to work: Doesn't matter